Procedure
Surface preparation:
Stone / Existing concrete floor: Surface should be also free from dust, dirt, greasy and oily substances. Therefore, it should be brushed, grinded or sandblasted and after that cleaned with vacuum cleaner. The surface humidity content must be <4%.
Stamped concrete: The surface humidity content must be <4% and allow at least 7 days to pass between the application of new stamped concrete and painting it with the product.
Maintenance:
Cleaning the cured system is best done by mopping surface with mild soap and water or a mild detergent. Some cleaners may affect the appearance of the installed floor. Test each cleaner used in a small area, ensuring no damage occurs.
Notes
- Low temperatures and high humidity during application prolong drying time, etc.
- It should not be applied to surfaces that have been painted previously with materials based on silicone or waxes.
- Neodur® Stone Varnish is a penetrating sealer. Usually one layer is sufficient enough to protect the substrate.
Cleaning of tools
Clean all tools and application equipment with solvent Neotex® 1021.
Stain removal
Use the solvent mentioned above when the stain is still fresh and damp. In case of hardened stains, use mechanical means.